Fire
Finbar Apartment Developments
Client: Hanssen
Service Provided: Fire
Year of Completion: 2003 to date
Project Cost: Ongoing
Location: Perth WA, Australia
B&E has been very proud of its long-standing relationship with Finbar Group and Hanssen Construction. We have been involved in every apartment development since 2003, having completed approximately 40 projects to date with these great Clients. We look forward to continuing this relationship in the future. The largest project to date is Concerto Apartments on the old ABC site, Wellington St, Perth at 45 storeys high.
Hitachi Machinery Corporate Services Group Facility
Client: BGC Constructions
Service Provided: Fire
Year of Completion: 2016
Project Cost: $1,850,000
Location: 107 Allen Rd, Forrestdale WA, Australia
B&E was successful in obtaining a multi-services package contract with BGC Constructions on the Hitachi Machinery project in Forrestdale. This project was a new build for the heavy machinery and equipment manufacturer with new offices, warehousing and workshop areas. Our contract included fire pumps and tanks as well as wet fire sprinkler systems throughout the offices and warehouse areas. The contract also included the dry fire alarm system installation.
- Fire pumps and tanks
- Complete fire sprinkler system to all office areas and warehouses
- Fire hydrant and hose reel system
- Fire alarm detection and emergency occupancy warning system
Aloft Hotel
Client: BGC
Service Provided: Fire
Year of Completion: 2017
Project Cost: $2,000,000
Location: 25 Rowe Ave, Rivervale
B&E designed, supplied and installed a complete wet fire system installation on this 224 room, 15 storey hotel with adjoining retail/office space building and multi-storey carpark. We supplied and installed fire sprinkler, hose reel and hydrant systems including fire pumps as well as involvement in some of the fit out of the office floors after construction was completed.
- Design and construct of complete wet fire solution
- Complete fire sprinkler installation to carpark, retail/office areas and hotel
- Fire hydrant and hose reel system
- Fire pumps
PBSA Stirling St Student Accommodation
Client: BGC
Service Provided: Fire
Year of Completion: 2018
Project Cost: $1,535,000
Location: 89-95 Stirling St, Perth
B&E were involved in this 23-storey student accommodation building constructed by BGC in Stirling St, Perth. We supplied a complete wet fire system solution including multiple fire pumps, fire sprinkler, hose reel and fire hydrant systems throughout the building and carpark areas.
- Design and construct of complete wet fire solution
- Wet fire sprinkler system
- Fire hydrant and hose reel system
- Fire pumps
Opal Aged Care – Carine
Client: BGC
Service Provided: Fire
Year of Completion: 2018
Project Cost: $400,000
Location: 29 Silica Rd, Carine
B&E was involved in construction of a new Opal Aged Care Facility in Carine working with BGC Constructions. This newly completed 145 bed residential facility was completed in 2018. B&E provided the fire sprinkler system throughout the entire facility.
- Wet fire sprinkler system
Banksia Grove Shopping Centre – Woolworths
Client: BGC
Service Provided: Fire
Year of Completion: 2018
Project Cost: $1,820,000
Location: Joondalup Drv, Banksia Grove
Supply and install of specialised smoke exhaust systems, the fire sprinkler system including pumps, tanks and all internal fire hydrants and hose reels.
- Wet fire sprinkler system throughout shopping centre including Woolworths
- Internal fire hydrant and hose reel system
- Fire pumps and tanks
- Smoke spill fans
Vantage Apartments
Client: BGC
Service Provided: Fire
Year of Completion: 2019
Project Cost: $5,000,000
Location: 60 Riversdale Rd, Rivervale
With 212 apartments, 13 storeys and 4 storeys of basement including car park, this riverside project is another collaboration with BGC. Due to a very tight corridor each trade (fire, refrigeration, hydraulic and electrical) was given a designated zone to keep their services in, this was modelled and co-ordinated by B&E Fire.
- Wet Fire Sprinkler Systems
- Hose reel and hydrant System
- Fire pumps
Opal Aged Care – Alfred Cove
Client: BGC
Service Provided: Fire
Year of Completion: 2019
Project Cost: $1,920,000
Location: 94 Kitchener Rd, Alfred Cove
B&E was involved with another new Opal Aged Care Facility in Alfred Cove working with BGC Constructions. This newly completed 119 bed residential facility was another multi-services project for B&E installing both the fire and mechanical services.
- VRF and standalone air conditioning systems throughout facility
- Supply and exhaust air ventilation systems
- Evaporative cooling system
- Fire pumps
- Wet fire sprinkler system
- Fire hydrant and hose reel system
3-5 Loftus St, Leederville
Client: Geogiou
Service Provided: Fire
Year of Completion: 2014
Project Cost: $3,900,000
Location: 3-5 Loftus St, West Leederville
B&E Fire supplied and installed a complete wet fire system solution to this nine-storey building including the multi-level carpark, office spaces and residential apartments.
- Fire sprinkler system to carpark, retail and offices as well as apartments
- Fire hydrant and hose reel system
- Fire pumps
Koh I Noor
Client: Pindan
Service Provided: Fire
Year of Completion: 2018
Project Cost: $ 1,376,000
Location: 34-38 Pangbourne St, Wembley
B&E provided a combined service package to Pindan Constructions for a newly built, 80 room aged care facility in Wembley. Services were provided throughout the facility including all bedrooms, bathrooms, laundries, common areas, administration and facilities management areas.
- Wet Fire Sprinkler Systems
- Hose reel and hydrant System
- Fire pumps
- Carpark Ventilation Systems
- Air conditioning systems
- Exhaust and supply air ventilation systems
- Evaporative air conditioning
Curtin University
Client: Curtin University
Service Provided: Fire
Year of Completion: 2011 – 2015
Project Cost: $ 2,200,000
Location: Kent St, Bentley WA 6102, Australia
B&E was involved in several projects around the Bentley Campus. Major projects included Building 204, Building 301, Building 410 and Building 614.
Works included major chilled/heating water air conditioning upgrades to offices and administration areas, classrooms, specialised laboratory fit outs and general ventilation systems. There was also a complete fire sprinkler installation including fire pumps and tanks with Georgiou Constructions to Building 410.
- Fire pumps
- Fire sprinkler system
- Chilled and heating water pipework upgrades
- Chilled water pumps
- Chilled and heating water fan coil units
- Evaporative coolers
- Complete BMS controls upgrades
- Exhaust systems
- Ventilation systems
- Laboratory fit outs including specialised exhaust systems, fume cupboards and nederman arms